Multi-technology Case study: Salston Manor, Devon

Multi-technology Case study: Salston Manor, Devon

We were proud to partner with PCR Homes and N A Guppy Ltd to bring a historic site in Devon into the future.

 

Products Used

Heat Interface Units in each apartment being powered by 7000 WP commercial gas boilers in a central plant room ​

Compress 7001iAW Heat Pump​

Compress 5800iAW Heat Pump​

Pre-plumb cylinder ​

Read more

New Build Case Study: Acorn Property Group (Compress 7001i)

New Build Case Study: Acorn Property Group (Compress 7001i)

We’ve been involved with the development of Acorn Property Group’s Hazel Green site providing our Quiet Mark certified Compress 7001i AW heat pumps and complete system solution, successfully supporting the transition to a greener choice.

 

Products Used

            Compress 7001i AW heat pumps

Read more

New Build Case Study: Williamsfield

New Build Case Study: Williamsfield

By installing a combination of Worcester’s Greenstar Combination and System gas-fired boilers, the NHBC registered developer was fully assured of the high quality and hugely efficient heating and hot water performance in each property – a factor deemed key to the development’s sustainability credentials.

Products Used

  • Greenstar gas-fired condensing combi boilers
  • Greenstar gas-fired condensing system boilers

Read more

New Build Case Study: Leeds Federated Housing Association Ltd

New Build Case Study: Leeds Federated Housing Association Ltd

We are currently installing Worcester’s Greenstar combis into a range of properties from one bedroom flats to four bedroom houses as part of a longstanding relationship with the manufacturer

Products Used

  • Greenstar gas-fired condensing boilers

Read more

Local Authority Case Study: London Borough of Barking and Dagenham Council

Local Authority Case Study: London Borough of Barking and Dagenham Council

We worked with Worcester on a project in the Barking and Dagenham area, which required installing twenty five Greenstar 30Si Compact and one 36CDi Compact gas-fired boilers

Products Used

  • Greenstar  gas-fired condensing boilers including CDi Compact

Read more

Local Authority Case Study: Broadacres

Local Authority Case Study: Broadacres

Since installing the specified Worcester products, we’ve seen a 98% reduction in repairs compared to the previous systems. This is a significant cost saving and also crucial for our service provision to an area of our stock that houses some of our most vulnerable tenants.

Products Used

  • Greenstar gas-fired condensing boilers

Read more

New Build Case Study: Redrow Homes

New Build Case Study: Redrow Homes

When the local planning authority implemented a 10% renewable policy we considered different technologies for our off-mains properties. We worked with Worcester, Bosch Group’s Heating Design Team and after a comprehensive specification process, we decided to install six Greensource split air to water heat pumps across six properties

Products Used:

  • Greenstar CDi Compact LPG-fired condensing boilers
  • Greenstore solar compatible unvented cylinders
  • Greensource split air to water heat pumps

Read more

Local Authority Case Study: Leeds Federated Housing Association Ltd

Local Authority Case Study: Leeds Federated Housing Association Ltd

The after sales support is another reason why Worcester stood out to us as the preferred manufacturer. We have found confidence in knowing that they are only a phone call away and can offer us support on any issues we have.